Estudos de caso Ver tudo
Cyprus (EAC)
120MW emergency power solution installed in just 20 days from equipment arrival.
Egypt (ETHYDCO)
Three-turbine bridging power solution for major chemical facility awaiting completion of permanent generation.
Libya (GECOL)
450MW fast-track baseload operation across six sites, supporting aging infrastructure.
Oman (OPWP)
24MW fast-track solution providing seasonal back-up power to support the national grid during the peak demand period.