Fast-track, Scalable Power

APR Energy’s bridging power solutions deliver urgently needed, large-scale electricity in just weeks, helping industries stay online while long-term power facilities are developed. Traditional plants can take years to plan, finance, and build. Our mobile and modular generating technology, such as the GE TM2500, can be transported, installed, and commissioned in as little as 30 to 90 days, ensuring reliable electricity for as long as it’s needed.

Key Benefits

Power delivered in 30–90 days
Large, mobile generating fleet of gas turbine generators
Leading-edge modular technology
Turnkey approach with full-service operation
Scalable from 20-500 MW+
Balance of Plant assets available (transformers, switchgear, substations, and fuel storage)

Built for Critical Applications

Bridging Power is especially valuable for industries where uptime is essential. Our solutions can provide behind-the-meter capacity for data centers, stabilize grids, support distributed generation, deliver emergency response after disruptions, and maintain supply while permanent facilities are under construction or repair. Plants can operate in peaking, standby, or baseload modes, depending on customer needs.

From Bridging to Permanent Power

APR Energy provides more than temporary solutions. We deliver a clear path forward. Our Bridging Power ensures reliable electricity today, while our Permanent Power solutions offer long-term generation for the future. Customers also benefit from our Mobile Gas Turbine fleet and complete Balance of Plant assets, including step-up transformers and substations, SCR’s, fuel systems and storage, metering, remote monitoring, and more. Together, these resources provide a full turnkey solution that makes the transition from bridging to permanent power seamless.

Fast, Flexible Solutions

Our mobile fleet is designed for speed and adaptability. Plants can be deployed in as little as 30–90 days, providing dependable power during construction delays, capacity shortfalls, or growth periods where permanent infrastructure is not yet ready. With solutions that are modular and scalable from 20MW to 500MW+, we deliver exactly the capacity required, when it’s needed most.

A Customized, Turnkey Approach

APR Energy combines advanced engineering, logistics, and installation processes to deliver plants that are cost-effective, safe, and dependable. While our approach is turnkey and modular, every project is customized to match a customer’s voltage, fuel, site, and operational requirements. From initial design through operation, we manage the entire process so customers can focus on running their business.

With APR Energy, Bridging Power is a strategic step that gives customers confidence today and a seamless transition to secure, permanent electricity for the future.