Libya | GECOL
450MW fast-track baseload operation across six sites, supporting aging infrastructure.
Applications:
Bridging Power
Baseload Operation
Oman | OPWP
24MW fast-track solution providing seasonal back-up power to support the national grid during the peak demand period.
Applications:
Peaking Power
Japan | TEPCO
Over 200MW of rapidly delivered emergency power following the 2011 earthquake and tsunami, supporting rebuilding and disaster recovery.
Applications:
Emergency Power
Standby Power
Cyprus | EAC
120MW emergency power solution installed in just 20 days from equipment arrival.
Applications:
Emergency Power
Peaking Power
Peru | ELP
60MW of emergency power to offset infrastructure delays and hydro shortages.
Applications:
Emergency Power
Peaking Power
Haiti | United Nations
Power generation solution distributed across 26 sites to power the United Nation Stabilization Mission in Haiti during 2007-2012.
Applications:
Emergency Power
Baseload Operation